Carriageway surface dressing

Posted on June 03 2015

The main road through Morton is to be surface dressed some time between 19 June 2015 and 30 September 2015, along with other roads in neighbouring villages. There will be reduced speed limits in place whilst this work is carried out (and presumably also parking restrictions).